Proposal for a New School Facility

As the population of students admitted every year continue to grow, it have been noted that there is congestion in most of the faculties. Therefore, there is a need to build another facility that will accommodate more students. Each year the number of students admitted for their first year course is increasing, and the current facilities and equipment need to be added to ensure that the congestion experienced now gets reduced. The new facility will also have additional computer labs and other laboratories to ensure that the practical courses have adequate space to conduct their activities. It has also been noted that the students have been carrying desks to their lecture rooms, and this new project also proposes that new desks should be bought to add to the existing ones. The students have been spending a lot of time searching for a desk to sit on, and this has led to time wastsge and disruption of classes, as they try to create space fir the late students. Therefore, this new facility will be a five storey building that will accommodate the two faculties that have the highest number of students as a way to decongest the institution.

The scope of this project will involve activities such as, this project will take around one year to be complete if all things go as planned. The institution will ensure that before new students are admitted next year, there will be a new facility to accommodate them. The new facility will be ready for use before the year ends, and the identified faculties can shift their operations there. All the stakeholders will have to communicate effectively and in case of any changes they will be communicated to and by the head of the project, who is the dean of students. The stakeholders f this project include the board of directors, students, lecturers, parents, and other donors. The stakeholders have to determine the design of the facility. The information will be collected through questionnaires to determine the most preferred interior and exterior designs.

The proposed budget for this project is $5000000, which I think it will be enough to cater for all the expenses for this project that will take one year to be complete. The project will involve various workers and engineers and they will be on a one year contract. One of the engineers will be selected as the foreman of this project, and will report directly to the project manager for recommendations or any other changes. The project will use the modern internal and external designs that the stakeholders have proposed, but the most affordable design will be selected. The foreman is expected to organize the workforce that will ensure steady construction for the given period. Any changes in the budget or any other aspect will have to be authorized by the stakeholders.

The design elements for this project include; the project will use thick lines to separate various rooms. The project will use primary colors depending on the theme of the institution and the faculties that will occupy the building. The school have provided a half an acre for this project, and therefore, the building will have a rectangular shape to ensure that it occupies most of the space of the half an acre provided. The building will have to occupy most of this space to fulfill the intended purpose of having a mega building in the school. The texture of this project will be a three-dimensional. Moderate elements size will be used for this project for easy visibility. The asymmetric balance will be used for this project due to its eye-catching nature. The project ought to be pleasing to all people since it will be the first modern building that the school will have. Harmony of all elements will be crucial to ensure that the result product is viable. All the design elements must be compatible with each other to ensure that the result is appealing and it reflects what a modern building should look like. The bidding strategy of this project will include; the total costs of materials will be $1500000 plus a markup of $500000. The labor costs will be around $750000. The estimated inspection period will be one month. The inspecting officers are estimated to take a maximum period of two weeks to respond to the inspections requests. The cost overruns are estimated to be $1000000, and the total bidding cost will be$3750000.

The construction process includes the concept process where the stakeholders determine the crucial aspects f the building. They determine the location as well other standards that must be fulfilled to create the appropriate building. the stakeholders of this project have determined that the building will occupy a half an acre and all the necessary standards are stipulated in the design elements. The engineers and architects will ensure that the building complies will all the legal requirements as well as the vision of the stakeholders. They will align the interest of the owner to the legal framework and carry out the project accordingly. The pre-construction process will include the selection of the contractor, project manager, contract administrator, safety and health manager, field managers, and superintendent. All these selected people will work together to initiate the construction process. They will visit the site to examine it and soil testing a crucial part of site examination. All the information, findings and plans are presented to the city authorities to ensure that all opinions and concerns get addressed. The procurement department will now order for the construction materials to commence the construction process. The contractor will be responsible for ensuring that appropriate number of laborers is available to undertake the construction process. The construction stage will involve having a pre-construction meeting that will discuss how the job site will be accessed, and the project’s quality control. It will also discuss the working hours of everyone and the process and location of storing materials. Each worker will be given a working schedule and the contract’s terms and conditions. The project can now begin and to ensure that the plans are safely stored, they should be stored in a digital garget for easy access and retrieval. The post-construction process involve the commissioning the building to the owner, the owner occupies the building, closure of the project, and closing remarks from the contractor and the owner.

The summary of the project; the project is estimated to take a period of one year, with an estimated budget of $5000000. The building will occupy a half an acre, and all the designs elements and bidding estimates are provided by the stakeholders. A contactor will be selted that will be the head of operation for the project, and the workers. each worker will be given a work schedule that will determine the working hours as well as other terms of employment. All suggestions and concerns will be communicated to the contractor who will then pass them to the stakeholders for consideration. The procurement department will be in charge of acquiring all materials needed for construction, and payment of the workers. The post-construction process involve the commissioning the building to the owner, the owner occupies the building, closure of the project, and closing remarks from the contractor and the owner.

The lessons learned from this project are that planning is a crucial part of executing a project. With a plan, it is possible to conduct any project whether big or small. A plan contains all the activities that need to be carried out as well as how and when they should be carried out. The project has shown me that it is possible to do anything as long as one has goals and is committed. Working as a group will help provide better results and having a good leader will help mobilize the available resources to produce the required or better results. There are many obstacles that may occur along the way but remaining focused and committed will help a person deliver the work as intended. Documenting the plans that one has is also crucial to the achievement of the set goals. Information should be stored in a permanent place that can be easily be retrieved for reference. Communication also help fulfill the intended goals of any project. There should be proper communication between the owners, contractor, and the workers. any opinion, suggestion, or concern raised should be addressed appropriately and feedback or actions are taken.

 

  Remember! This is just a sample.

Save time and get your custom paper from our expert writers

 Get started in just 3 minutes
 Sit back relax and leave the writing to us
 Sources and citations are provided
 100% Plagiarism free
error: Content is protected !!
×
Hi, my name is Jenn 👋

In case you can’t find a sample example, our professional writers are ready to help you with writing your own paper. All you need to do is fill out a short form and submit an order

Check Out the Form
Need Help?
Dont be shy to ask