I was hired to direct a two-year deal to construct 30 single domestic households in Dallas City, Texas. The design is complicated due to limitations and boundaries in the job breakdown framework. Project Goal: AN Investor is seeking to expand its assets and has engaged Constramaster Construction Company to construct 30 single domestic households in Dallas, Texas. Constramaster Construction Company has indeed completed and obtained all county permissions. The project must be finished no later than two years and must not surpass a maximum of $15 million.
1. This project’s three primary objectives:
2. Don’t surpass the budget. The homes must be approved by the architect hired and the investors.
3. The building has to comply with the agreed time frame in the contract.
Deliverables: develop design specifications, develop and implement draft proposals and schedules with the architect team and choose competitive vendors to choose the lowest-priced vendors, and fix any problems that arise in the initial phases. Completed home features include 4,800 sq ft, five bedrooms, and three bathrooms. Homes must be integrated with premium security features, including the electric fence. Surveillance cameras, fire protection systems like sprinklers, detectors, and warning systems to notify people in case of any emergency, CO2, and gas extinguishers as well as optionally upgraded standard domestic equipment.
Milestones:
1. Have 5-6 months to approve plans and requirements.
2. Providers of analysis, pricing accepted, contracts are drawn up.
3. In 18 months of inspections, the first 15 homes are completed and approved.
4. All houses must be sold in advance of the building (30 months).
Consult with real estate departments to customize and demanding clients.
Technical requirements: Homes must meet with architectural construction standards. This regulation contains Structure, plumbing, mechanical, electrical Installation, and air conditioning. Roofing–roofing kind, weight/size/ roofing period; Specify how valleys are weather-resistant for low-pitched roofs and complicated roofs with valleys. Get comprehensive components and roofing equipment installation specifications for timber, steel, tile, slate, and polymer materials. Determine the type, design, and energy efficiency of doors and windows. Include the windows and doors with blink specifics to avoid the frequent leaks. Models for storm and seismic loads: windproof roofing, impact-proof frames, engineered frame clamps, and shear wall specifications. To obtain a drywall finish it should not include: any connection noticeable from a stationary position that faces the surface 6 feet away under regular light conditions, and any nail pop, crack or other faults noticeable from a stationary position with a head facing the surface 6 feet away under standard lighting conditions.
Limitations and Exclusions: working approvals allow for building to be carried out Monday-Friday from sunrise to sunset and restricting the use of machinery and equipment that surpasses the level of noise of 115 dB (A) by 10:00 a.m. to 5:00 p.m.
Customer review: Consumer assessments are performed routinely in compliance with requirements.